Before the first coat
A specification for a period home
A house can contain work from several periods. Begin with what survives, what has changed and what needs repair, then define how the new decoration will meet those existing surfaces.

Highgate has more than one architectural language
Camden’s village appraisal records Georgian and early nineteenth-century houses. Haringey describes Arts & Crafts details around Cholmeley Park, while Holly Lodge’s interwar development has its own garden-suburb character. Gothic Holly Village is different again. The local documents provide context; the age of the neighbourhood does not tell you what every wall or window in a particular house is made from.
Sources: Camden: Highgate Conservation Area appraisal; Haringey: Highgate appraisal, part 1; Camden: Holly Lodge Estate appraisal; Historic England: 1–12 Holly Village
Record an element, its condition and its boundary
Give each room a list of walls, ceiling, cornice, doors, windows, shutters and fitted joinery. Note what is to remain untouched. Photograph existing cracks, loose coatings and damaged timber so that assessment can precede the paint choice. Mark the points where new work meets retained decoration; those junctions need an agreed treatment too.
Put repair decisions before the paint schedule
A decorating quotation should distinguish ordinary preparation from repairs requiring further investigation. For a listed building, confirm whether proposed removal or alteration of historic fabric needs consent. Haringey’s guidance includes interiors within listed-building protection, so an internal location does not automatically make a change unrestricted. Include any specialist advice and permission conditions in the written scope.
Sources: Haringey: work to a listed building
Keep a usable finish record
For every approved surface, retain the manufacturer, product, colour reference and sheen, together with the sample used for the decision. Check preparation and application requirements against that product’s instructions. Agree how discoveries and changes will be recorded during the work. At review, use the same element list so the scope remains clear from the first conversation to the final inspection.
Your Highgate project
Let’s put your
project into words.
From the first room to the external joinery, tell us what needs attention and what you would like to retain.
Let’s discuss the work
Include the address, current condition and any access arrangements.